top of page

Define a transformer requirement

A useful technical enquiry should describe the electrical duty, the site and the acceptance requirements.

Electrical duty

Rated MVA, primary and secondary voltages, frequency, impedance, vector group and tap range.

Site conditions

Ambient temperature, altitude, pollution or coastal conditions, available footprint and transport limits.

Performance priorities

Loss evaluation, cooling, sound limits, reliability needs and monitoring interfaces.

Testing & delivery

Applicable standards, required tests, documentation, destination and target project schedule.

Planned power transformer portfolio

A phased development programme for high-voltage transformers and future power equipment, built around technology transfer, engineering readiness and customer requirements.

PHASE 1

132 / 230 / 380 kV

Initial development scope: high-voltage power transformers for utility transmission and major industrial power systems.

132 kV

72 units/year planned

230 kV

48 units/year planned

380 kV

12 units/year planned

Total planned design capacity: 132 units per year. These figures describe the project's design plan, not current production or confirmed delivery capacity.

Final MVA ratings, winding arrangements, cooling systems, insulation levels and accessories will be defined through engineering and customer specifications.

PHASE 2

500 / 700 kV class

A planned expansion into higher-voltage transformer classes within the project site. Implementation depends on technical readiness, test capability, qualification and market requirements.

PHASE 3

GIS equipment

A future development phase for gas-insulated switchgear and integrated power equipment. Detailed product scope will be developed through the project's engineering and qualification process.

bottom of page