A phased path to industrial capability

The roadmap sets out the project's planned product expansion and the readiness milestones required along the way. Timing is subject to engineering, approvals, qualification and implementation.

PHASE 1 โ€” Establish the foundation

132 / 230 / 380 kV power transformers

Planned design capacity of 132 units per year: 72 units at 132 kV, 48 at 230 kV and 12 at 380 kV. Establish manufacturing processes, workforce capability and the qualification pathway.

PHASE 2 โ€” Expand voltage capability

500 / 700 kV class

Planned expansion within the project site, subject to technology readiness, testing capability and market requirements.

PHASE 3 โ€” Broaden the equipment platform

GIS equipment

A future phase for gas-insulated switchgear production and integrated power equipment.

Readiness before scale

Engineering & site planning

Define the technical scope, facility needs and implementation requirements.

Technology & workforce

Transfer documented methods and develop trained manufacturing and engineering teams.

Prototype & qualification

Validate designs through the agreed test programme and customer qualification process.

Production readiness

Confirm processes, traceability, supplier readiness and delivery arrangements before commercial supply.

Planned industrial base

Rabigh, Saudi Arabia. The site strategy is intended to support phased manufacturing expansion, practical training and future logistics needs.

Project updates

As of 21 September 2026, SBM remains a project in development. The proposed industrial base is Rabigh, Saudi Arabia, with a phased transformer and power-equipment roadmap.

This section will record confirmed milestones in engineering, site readiness, workforce development and product qualification. Construction progress, commissioning dates and commercial production milestones will be added when verified.